Roadmap · 2026–2029
Done, and not done yet
Filled marks are work done. Open marks are targets and goals, not commitments: dates can move, and nothing here is a promise to deliver a product by a stated date.
Design & prototype
2026
- Done: Concept fleet designed and public — digital, not physical
- Done: Cyclotis design locked as the flagship
- Done: Velma specification published
2027
- Target: Begin building the first running prototype
- Target: Cyclotis powertrain bench validation
- Target: Refine GT-1 and Foundry 427 toward prototype
2028
- Target: Demonstrate the first running prototype in public
- Target: Begin the Velma prototype
2029
- Target: Small-series production feasibility study
- Target: Begin homologation planning
Company
2026
- Done: Incorporated: Schubert Motors USA Inc., Delaware C-Corp
- Target: Secure honest funding for the prototype
- Target: Identify fabrication partners for a one-off build
2027
- Target: Secure prototype build space
- Target: Source one-off parts for the first prototype
2028
- Target: Pilot assembly of the first prototype
- Target: Tooling study for low-volume production
2029
- Target: Low-volume production decision
- Target: Facility planning, if funded
Technology & service
2026
- Done: Axial-flux motor design work, ongoing since 2009
- Done: MWVCS diagnostics software written
- Target: Commit to open service documentation
2027
- Target: Bench-test an axial-flux motor prototype
- Target: Validate control software on prototype hardware
2028
- Target: Demonstrate the hybrid system in a prototype
- Target: Verify design targets against measurements
2029
- Target: Homologation-ready powertrain
- Target: Independent-shop service model